It’s now been two weeks since the plasterers left us with a totally transformed space. The photos don’t really do it justice, because it looks absolutely stunning:
We’re going to leave it for a few months – probably until summer – before we paint it. Advice was to leave it a year, but my level of impatience is too high for that, so we’re compromising at 8 months.
We’ll be using clay-based paint designed to go onto lime plaster, so there’ll probably be lots of posts about which colours we like and how we can’t decide.
Next job in the attic is to finish sanding and oiling the timbers. We need to lightly sand all the timbers, in fact, to take the plaster off.
Then we’ll be putting in the electrics. Yes, yes, we should have done all that before the plasterers arrived but things got on top of us and we got overexcited about the plastering. So we’ll be looking for surface-mount LED spotlights for the ceiling, and using that gorgeous old-fashioned braided flex for the wiring that’ll be exposed.
After Christmas – if we’ve got enough cash! – we’ll be getting the window in the wonky room knocked back in and the 8″x8″ beams installed to reinforce the attic floor.
We got John and his team from PlasLime to come and do the work, and they were brilliant. A total delight to have around the place, and really careful about keeping everything as clean and tidy as possible. We were pleasantly surprised at how little dust there was.
The bill was huge… but it was totally worth it. Beans on toast until springtime.