Restoring an old cottage...

Category: bathroom (Page 2 of 2)

Much Lofty Excitement!

We are pleased to announce that the resident bats now have a more luxurious living space than we do.

The space above the bathroom-to-be is now insulated, boarded, and housing our camping gear, some books, and a load of shoes.

I spent a dusty afternoon up in the rafters with Henry hoover and filled three hoover bags with bat poo, cobwebs, and dust. Let’s take a little look at the before:

Dusty dusty dusty

Dusty dusty dusty

And the after:

Dust and cobweb and bat poo free!

Dust and cobweb and bat poo free!

Tidy!

Once that dirty job was out of the way, I, Joe, and my dad Adrian filled the spaces between the ceiling joists with Thermafleece natural sheep wool insulation—150mm of it. If we were building a modern house we’d have to adhere to building regulations which state a minimum of 270mm insulation—and we may add a layer in the future, but for now we’re sticking with 150mm because a) immediate cashflow, b) the logistics of adding extra height to accommodate extra thickness would be a pain in the butt, and c) the benefit of extra insulation after 150mm is not significant.

Graph showing diminishing return from extra thickness of insulation

Graph from The Greenage

Check out this site (where I found this graph) for more information.

Thermafleece sheeps wool insulation laid between ceiling joists.

Thermafleece sheep’s wool insulation

Once the insulation was in, we boarded out the loft using Wickes’s structural OSB loft panels. I measured, Joe and my dad cut, and I laid them all and screwed them down.

Tidy stone wall, rafters, and freshly laid OSB loft boards

Floorboards down—and it’s transformed the look and feel of the space

The loft was kinda my little project.

We’ve left the screws a bit half-done because we’ll need to take up some boards to lay down wiring and fit lights into the ceiling. We also need to add a little extra boarding right up to the edges of the roof—although we may possibly board vertically where there’s little usable space. We’ll see.

An old IKEA shelving unit made its way up into the loft, too. We were going to get rid of it entirely as it was pretty ugly and took up too much space in the living room—then realised it’d be useful up in the loft to give us more tidy storage space. More shelving will go up there eventually so we can make good use of the space we have—storage space is pretty hard to come by in this cottage.

Camping gear stored in IKEA shelving unit in loft

Clean, dry, non-dusty space for our camping gear

Look what we moved from the Wonky Room:

A big pile of camping stuff and general crap

All this stuff went upstairs into the loft—hurrah!

To the loft:

Show boxes lined up in the loft under the low edge

Happy shoes

Finally we added a temporary battery-powered LED light; eventually we’ll get an LED strip to go along the ridge beam.

Ta da! We’ve significantly increased the size of our house, which feels pretty cool.

The Stone Room Floor of Death + Woe

That floor we opened the last post with? Yep, time to go. It’s been grim. Really really grim.

We started downstairs in the Rayburn Room and ripped all the weird fake panel bits off the ceiling:

Ceiling panels

Ceiling panels were kind of structural…

Stripped off the fake panelling

Stripped off the fake panelling

Then we put on masks and gloves, took a brave pill, and Went Upstairs.

And discovered such delights as this section of floor which isn’t really attached on one side at all hahahaHAHAHA such fun!

Gap between floor joists lovely

This floor is actually held up here with hope

And this exciting bundle of bare wires that go who knows where and are stuffed into a broken junction box under the floor with highly flammable wood and dust and crap WOO!

An exciting collection of wires going who knows where

Fun with wires!

And this floor joist which is two scraps of wood held together by one old nail which I put my foot on AND NEARLY DIED SUCH LARKS!

Secure floor

Secure floor

We perfected our balancing techniques (and when I say we I mean Joe because I got proper vertigo up there looking through the floor at the room below it’s NOT RIGHT) and pushed out all the MDF ceiling panels. Which, we truly believe, were partly structural. Which is also terrifying.

In the end, though, we dragged out everything and ended up with this magnificent, cathedral-like space:

Truly cathedral-esque

Truly cathedral-esque

And this exciting door into nothingness:

White wooden door with black iron hinges opening onto nothing

It’s like a haunted horror house

So, yep.  Next thing was to fit the wall plates, which you can see my dad working on in the pic above, and then the floor joists, which we pretty much fitted in the same way as we fitted the ceiling joists above. More on that later…

The Floor + Ceiling of Almost-Certain Death

When you think about a floor, what do you picture?

Boards, maybe a carpet or rug… and beneath it, strong sturdy wooden joists built to last forever (more or less) and carry multitudes of footsteps..

That’s what we picture.

What we don’t picture is THIS:

The underside of the bathroom floor, scraps of timber joined with bolts

Fun with floors!

Note the poorly joined random scraps of wood.

This part was fun too—see the actual gap where the joist fails to connect with the beam?

Bits and pieces of timber joined to fill gaps when the staircase was removed

This is where an old staircase used to be

This is actually cool though because from the shape of it and the retro-bodging, we’re pretty sure there was a staircase in this corner of the room. We know this end of the house—the stone portion—used to be the village shop, and we think it may have been two separate dwellings at one point. So it makes sense that it’d have its own staircase.

Honestly I don’t know how we didn’t fall through that floor in the four years we used it as a bedroom.

But no more! Because we’re finally turning the Stone Room into a bathroom and the Rayburn Room into a library. Hurrah!

Before we go on, though, let us say this: although we’ve uncovered some fairly horrifying electrics and alarming structural stuff, we’re having a great time. Not just because this is genuinely fascinating and fun and we’re learning lots, and it’s extremely satisfying creating a home with our own hands…

But also because we’re getting a real insight in the history of the house and the resourceful and innovative (and delightfully eccentric) people who’ve lived here.

It’s a story of people who wanted to reuse as much as possible. Who perhaps didn’t have a huge amount of money, so did what they could with what they had. And who were absolutely unafraid of electricity.

We’re so grateful that we get to peek into some of this history, and catch a glimpse of the personalities who’ve lived here over the centuries. What a privilege to be the caretaker of a place like this 🙂

So. Here’s what we’ve done over the past few weeks, since the bats moved out (actually they never moved in again we don’t think, but we still held off work until the start of September)…

Stone Room Ceiling Horrors

We started by pulling down the ceiling in the upstairs Stone Room. My dad came to help and got thoroughly covered in dust, bat poo, and general awfulness from a roof space filled with 150 years of living. Oh, and we all enjoyed the exciting wiring, which makes absolutely no sense at all.

My dad in a mask up a ladder sorting errant wiring

My dad shortly after I yelled at him and Joe because they weren’t wearing masks

That ceiling structure, too, was made of spiderwebs and hope, but at least it didn’t have to actually hold anything up.

It came down pretty easily, which is when we spotted this:

View up into the eaves of the rubble wall, with loosely packed terrifying rocks

The Giant Death Rock of Damocles: yes, it’s that massive one right in the middle

This boulder is so big that we couldn’t lift it out. So we were somewhat alarmed when we touched it and it moved. And not just a fraction, but in a menacing way that suggested it had had enough of sitting in the roof space and was ready to come down and start a fight.

You’ll notice it’s positioned perfectly above the doorway and it absolutely would have crashed through the brittle plastic ceiling panel (not kidding it was plastic), onto the unfortunate person’s head, and thence through the floor to the Rayburn Room below. And probably from there into the molten centre of the Earth.

The first thing we did was mix up some lime mortar and cement it back into place, along with a few of its smaller but no less rowdy siblings.

So we’re no longer afraid of giant death from above, which is a relief.

Next up: clear debris from the tops of the walls and find stones suitable for drilling into and affixing a ring beam.

We levelled this around the room so it’s very horizontal. We’re pretty smug about this which is amusing because it’s now the only horizontal thing in the house.

Joe and my dad drilled 16 mm holes into the stone walls, and we inserted threaded steel rods. We hung off them to make sure they were strong enough. I think you could probably hang a car off them.

Joe angle grinds the bolts to a more sensible length. Many sparks.

Pretty fireworks so I immediately stopped proceedings to put up a firewall…

We are extremely ingenious and use a snow shovel to protect the flammable stuff from sparks

Very sophisticated firewall to prevent sparks from starting a fire that’d kill us all

In fact, we’re fairly sure that if the rest of the house falls down, that ceiling structure we’ve built will remain standing.

Next up: some scribing, maths, a little bit of swearing and sweating, and we drilled some holes into the ring beam to correspond with the wall bolts—and held our breath as we finagled it into place.

The ring beam placed above the bolts so we could scribe the distances and drill holes that actually fit

Much careful measuring and drilling of holes…

It fits! Hurrah!

Bolts in, and it’s time to do the other side.

Joe and I repeated the process on the opposite side of the room, et voilà! We have a ring beam.

Ring beam fixed to the stone wall with great big bolts

Woo hoo! The holes all matched!

 

Next job: cutting the cross joists to length and fitting them to the ring beam with brackets. This was a fiddly job made more fun by working at height on a wobbly floor covered with pieces of chipboard that may or may not collapse at any moment.

We used little pieces of wood to make hangers so we didn’t have to hold massive pieces of wood over our heads, then wedged the joists in tightly, then screwed the brackets into place—and tightened up all the ring beam bolts which had loosened as we expanded the house.

Little piece of wood fixed to the large joist to position it

Making our job easier with spare bits of oak

We’re pretty pleased with the result. The ceiling is probably strong enough to hold a bathtub. It’s what you might call overengineered, but that’s cool. It’s not going anywhere.

Joe hangs by his hands from two of the new ceiling joists

Joe proves that we are fine workpeople

(Aside: this moment started a competition which has not yet ended. Joe did one pull up, so I did three. Then Joe did three. So I did four. And so on. We’ll continue this until one of us is dead.)

Joists all fitted and looking solid

The joists are in!

Look at how wonky that roof is! Love it.

Then we fitted a loft hatch, because of course we did. Here it is, floating in a ceilingless ceiling:

The loft hatch ladder hangs down, forlorn and alone, in a ceilingless room

Loft hatch to nowhere

The ladder is very long and as yet uncut. Joe looks on, gurning.

Think there might be more ladder than room here

At some point, of course, we’ll put up a proper ceiling and cut the ladder down to size. But for now, we’re happy with our overhead installation art.

 

Surprise Windows

You wouldn’t think a person would forget they’d ordered—and paid the deposit for—very expensive oak windows, would you?

Well, we did.

Back at the end of June, I got a text message to say:

“I’ll be delivering your windows tomorrow afternoon—will you be in?”

“Um—what windows?” said we.

A little searching of memories and emails revealed the bathroom window order. And lo! the bathroom was on track again.

Side note: our deadline for having the new bathroom done is Christmas 2021. At which point I shall climb into a hot bath and stay there until spring.

So… yeah.

The Stone Room—soon to be the Grand Bathroom—now has beautiful new windows that actually close. And open.

It doesn’t have a ceiling, floor, or respectable walls, but who needs those things anyway?

Here’s what the windows looked like before. They were cheap, ugly, and single-glazed. The little one on the side of the house was so rotted it wouldn’t even close anymore, so this winter should be considerably less draughty…

View of old single-glazed window with platform on roof below

This is the old window facing the back garden

The side window in the stone wall

Side window was so rotted it wouldn’t close

3/4 view of exterior walls showing old windows

The old windows looking shabby

And from the inside, they didn’t let in much light, making a large room rather dingy and misery-bear:

View of the original window from inside the Stone Room

This tiny window didn’t let in much light

As you can see, we decided to enlarge the window opening as much as we could, bearing in mind the roofline below this window. It’s made a big difference.

Enlarged window opening complete with rubble on roof

A great big ‘ole

Here’s the rather alarming state of affairs we found when we pulled the old windows out and revealed the frameworks:

Blank window opening with wall held up by wood brace

Exciting times!

We discovered, on removing the old window, that the rotten old frame was structural. Standard! So Ken and Phil sourced a new lintel for us and fitted it, thus removing the risk of the entire wall collapsing on us in the bath. Hurrah!

And here are the new windows, looking rather gorgeous… and letting in much more light!

View of the new windows from the inside, letting in much more light

More light!

And the little side window is much more sturdy now:

Small window with new lintel above

Looking much sturdier

We still can’t do much in the bathroom because of the bats, but in August we are going to crack on with removing the floor and putting new extra-strength joists in, so it’ll support a bathtub.

Then in September, we can put in a new ceiling, make sure the bats are happy, and crack on with a proper bathroom.

EXCITING EXCITING EXCITING!

Bats in the Not-a-Belfry

There’s a line in the Discworld book The Truth, by Terry Pratchett, that goes:

“A lie can run around the world before the truth has got its boots on.”

Case in point: if you have or suspect bats in your house, They say that it’ll cost you one meeeeeeeeellion dollar to do any works you had planned, if you’re allowed to at all.

Honestly, the number of people who have said to us, when we’ve mentioned bats or newts, “Ooh don’t say anything because otherwise you won’t be allowed to do any work or make any changes and you’ll get prosecuted etc. etc. etc.”

I always suspected that was batbullshit, and I was right. Plus, we are tree-huggers and we are happy to host bats and newts. Bats eat midges. Newts are awesome.

(There are fascinating psychological reasons why this kind of nonsense story perpetuates despite a screaming lack of any evidence, and if you’re interested — and you should be — check out the book Made to Stick by Chip and Dan Heath.)

Anyway, back to the batshit.

The next mini-project in the ongoing saga of The Dingle is the Stone Room on the first floor. It is to become the Most Magnificent Bathroom in the World.

There’s plenty to do in there, and you’ll be able to follow along as we go… but one of the first jobs was to pull down the ceiling and put a new one in.

Because the current ceiling is made of spiderwebs, cheese, cheap bolts, and hope.

When we had our new boiler fitted (blog post to follow about that shortly), we were finally able to drag the water tanks out of the loft space above the Stone Room and get rid of them. When we went up there to do that, we noticed what a shocking state the ceiling was in.

And we also noticed this:

A giant pile of poo

A giant pile of poo

Which is a giant pile of what we thought was bat poo. Certainly very small poos, and lots of it.

We did some googling, crumbled it between our fingers, and came to the conclusion that it was probably bat poo.

Plus, we know we have lots of bats flying around The Dingle of an evening, and although we’ve never paid that much attention to where they appear from and disappear to, old houses are perfect for bats.

So I called the Bat Conservation Trust for advice.

(Actually, I called a consultant I found on the internet, and we had a chat, and he recommended I contact the BCT because they do free checks and advice, whereas we’d be paying him. Good man. Thank you.)

Today, a volunteer and a trainee volunteer from the BCT arrived and had a look around. In ordinary times, they’d have come in and poked around themselves, but COVID has scuppered that kind of thing, so we got modern and used technology.

They asked for samples of the poo, and we FaceTimed around the loft space.

Up I went in my overalls to stagger around on the ceiling (did I mention it’s made of cheese and spiderwebs and isn’t fit to support anyone let alone a person?) and gather little pots of poo.

The poo from the main pile was definitely bat poo. They’ve taken it away to see if they can identify what species we have. And the poo from the other end was bird poo and mouse poo. Which is good news for us if the bats are only at one end of the roof space.

We’re quite keen to get this sorted because there’s water ingress when it rains on the interior wall, where the flashing has come away from the roof-wall interface. You can see the water damage here:

Not really dry…

Not really dry…

Ken our timber guy reckons it’ll be fine with a bit of reinforcing which is grand because we DO NOT want to replace the purlin and do major roof works. Plus that will require all sorts of licences for the bats.

And at the other end, there are large holes between the wall and the roof, and some of the fascias are rotting so we’ll need to replace/repair and cover those, and we need to know what we can do.

Daylight where daylight should not be

Daylight where daylight should not be

The volunteers are going to write up their report over the next day or so, and put it through to Natural England as an urgent job for us.

We expect to hear back in 2—4 weeks, and he said it’ll probably be more like 2 weeks.

They could not have been more helpful. Their main aim is twofold: to protect the bats AND to enable us to get on with the work we want to do as quickly and inexpensively as possible.

They’re well aware of the nonsense people believe: that conservationists deliberately make it difficult for people to do work.

Of course they don’t. It’s not in their interests. Because when they make it difficult for people, people don’t declare bats and do all sorts of stuff that harms the bats.

Bats are great: they don’t cause damage, most of the time we don’t even know they’re there, and they eat tons of insects. A common pipistrelle bat can eat 3,000 midges and mozzies and flies in a single night!

And it’s really easy and inexpensive to provide for them.

The only issue really is timing: they build maternity roosts from around May until the end of August, so we won’t be allowed to do any work that could affect access between those dates.

That won’t be a problem for us, we’ve timed it well. We’ll be able to build the new ceiling and block the loft space off, leaving the bats in peace until the end of summer. Then we can go back up and do any further work we need to do.

Probably what we’ll have to do is partition off a portion of the loft space for the bats, and then put a droppings tray on the boarded out floor so we can remove droppings once a year. (Which is cool because bat droppings are fantastic fertiliser for my vegetable beds.)

We’re fine with that. It’ll cost us a few quid and we can do the work ourselves, and we’ll be helping the bats, which makes everyone happy.

So, if you suspect bats in your house, and you’re worried about it scuppering your plans to renovate or repair: don’t be.

Ignore people who like spread rumours without having facts, and give the Bat Conservation Trust a call. Their volunteers are super-friendly and helpful, and will work with you to do the best for you and the bats.

Thank you BCT!

Hammer House of Horror: The Bathroom Saga

Picture the scene: wind howls through the gaps in the stone.

Cobwebs like ropes caress the face like grimy ribbons.

And underfoot, there is a 1-inch carpet of mouse and bird poo… plus a dead sparrow.

Nope, we are not in a Hammer house of horror. We are in the space above what is to become our bathroom.

Look at the horrors!

But it’s all FANTASTIC news because we can finally crack on with said bathroom after 5 years of no proper heating and a tiny grimy shower room. Hurrah!

Ripping Stuff Out

Here’s what the Stone Room looked like just a few short days ago:

Joe stands in orange overalls dismantling the old immersion heater cupboard

Goodbye horrible old cupboard and immersion heater!

And look at this amazing 80s wallpaper 😀

Orange, brown, and yellow patterned wallpaper

Incredible 80s wallpaper

Last Monday, plumbers came and disconnected our hot water. They took the water tanks out of the loft space, emptied and removed the immersion heater, and left us to it for the better part of a week.

We had some sponge baths with boiled water from the kettle, and I washed my hair with water so cold it gave my entire head cramp. (Try it: it induces brain freeze the likes of which you have never experienced.)

Then the chaps came back and fitted our very first condensing boiler. Ta da!

The new boiler all plumbed into the corner of the room

Ooh fancy! Hot water AND heating…

We now have hot water on demand and A WORKING RADIATOR! The Rayburn Room is warm again!!!

(Side note: the Rayburn Room hasn’t had a working Rayburn for a year and is to become the library, that radiator is temporary because I want cast-iron ones, and there’s still a ton of plumbing to do.)

The plan is to eventually move the boiler downstairs into the utility room, but we won’t be able to build the kitchen and utility room for a couple of years yet. So for now, we’re building an airing cupboard around the boiler and plastering up to the board it’s fitted to.

And now all the gubbins is out of the Stone Room, it means we can start the long and disgusting process of turning it into a bathroom.

Things we have discovered so far:

  • The Stone Room floor joists are 3 inches deep by 2 inches wide, with notches for plumbing pipes. For those not in the know, that is Not Big Enough to support a floor. It’s amazing we haven’t plummeted through it.
  • Creative plumbing decisions.
  • Absolutely freaking terrifying ceiling joists that gave me the horrors climbing up there.
  • Horrifying wiring: bare wires nestled warmly into the fibreglass insulation.
  • A dead sparrow 🙁
  • A LOT of mouse/bird/squirrel poo. Like, piles and piles of it.
  • Birds’ nests.
  • The world’s most epic cobwebs, but no spiders, oddly enough.
  • Water running down the stone wall, which was nice.
  • Plenty gaps in the roof: much fresh air, which was nice I suppose.
  • Ceiling panels made out of cardboard. Also panels made out of that plastic we used to cut up in CDT classes at school.
  • Roof braces held on with old hinges.
Cobwebs and a pile of mouse/squirrel/bird poo on the stone wall

Lots of cobwebs, a nest, & a big pile of poo

Horrifying wiring junction buried in insulation

Honestly I’m amazed we haven’t had a fire

Water trickling down the inside wall above the ceiling

The leaky roof. Which is nice.

(Side note: fibreglass insulation is evil stuff and I am SO BLOODY ITCHY RIGHT NOW. And yes, I was wearing gloves and mask and eye protection and overalls and a hat and PPE up the wazoo and IT GETS EVERYWHERE. There’s a special place in hell for the person who invented fibreglass fuzz.)

Because I weigh less than Joe, I was duly shoved up through the hatch with a clamp lamp and a plastic bag. I set about rolling up the insulation and passing the tidy bits down to Joe, who bagged them. I bagged the scraps and bits and pieces up in the loft to prevent too much crap raining down on Joe.

Vicky’s feet dangle out of the loft hatch

Making my way into the unknown

We filled six huge bin bags, which Joe later hauled to the tip.

Black bin bags full of old insulation

All this came out of the loft space

I also removed several dustpans full of poo.

And lots of bits of paper, plastic bottles and canisters, scraps of insulation, tarry stuff that was coming away from the rafters, and pieces of MDF that were lying around looking like things to put weight on, but which were NOT for that at all.

Once we got rid of as much of the insulation and general rubbish as possible without falling through the ceiling, we started ripping the ceiling panels off and creating a big, big hole.

View from under the ceiling, through the holes, to Joe doing some wiring

Joe makes some wiring less scary

Oh, and unwiring some wires that didn’t seem to do anything anymore.

It’s been quite a day…

But at the end of it, we got to have an EPIC shower powered by our new boiler, with frankly quite alarming pressure, and so it wasn’t all bad.

Next in the Stone Room: continue removing the ceiling, sweep and hoover and make as tidy as possible, repair the leaky roof and the holes under the eaves, and hurl some lime plaster at the rough loose stone to make it a bit tidier and sturdier.

After that, we’ll pull all the old plaster off the walls and put in new oak windows (which we’ve just ordered), then take the floor up.

After that, we’ll replace the ceiling and the floor — at which point we can start actually creating a bathroom! And deciding whether or not to have underfloor heating…

UPDATE

Having done some searching of images on the Google, we now have a suspicion of bats. So we have a local batman on his way to do a preliminary survey. All work in the roof space has stopped for now, and the next thing we’re going to do is focus on the walls below the ceiling line and replacing the Stone Room floor, and stripping out the Rayburn Room.

Then we shall wait and see what the batman says and do what needs to be done.

Strip Some Wallpaper, She Said

As several years’ worth of rain has fallen in the past week, we decided against knocking a hole in the front of the house today.

(Of course, it’s been sunny all day so we could have done the wall panel in the end.)

Instead, we fired up the wallpaper steam stripper, opened the windows in the Stone Room, and got stripping.

A Little Background

The Stone Room is the Victorian addition to the house. It’s a square, solid stone, two-storey structure stuck onto the left-hand side of the original house. It’s offset slightly too – it protrudes about four feet to the front of the house, presumably because of the shape of the banks behind the house. But who knows.

There used to be a window in the front until the 1950s (we think), then the previous owner filled it in. We haven’t decided whether or not to reinstate it yet, but we’ll definitely be rebuilding the in-fill because it looks a mess from the outside and we’d rather it blends in.

The Stone Room was our bedroom until a month or so ago, when we moved up into The Beautiful Attic. It’s going to become our huge, decadent bathroom.

There’s a small-ish window in the back, looking up the garden, and a tiny window in the side.

Small windows

We’re going to make the window on the left bigger

We have plans to make the back window much bigger and take it down to the floor so Vicky can lie in the bath and look up the garden.

Saturday Stripping

Before any of that happens, though, we need to strip the room back to its bones. We’ll need to replace the floor so it can take the weight of a bathtub (and, you know, people) and we’ll need to replace the ceiling because it’s a bit of a horror show.

Also, the roof leaks and the roof space is dark and full of terrors.

Awful mess

The Stone Room roof space is dark and full of terrors

We also wanted to investigate the impression on the far wall – you can see where there was once a fireplace. We’re not holding out much hope, but you never know… We’ll probably put one back when we start making the room beautiful.

Before beauty, though, comes The Great Horror.

We stripped all the structural anaglypta wallpaper off…

Stripper Joe

Stripper Joe

And we found some cool remnants of old pretty wallpaper:

Archaeological wallpaper

Archaeological wallpaper

That Escalated Fast…

And knocked some bloody great holes in the wall. Which was exciting.

Turns out there’s just random bricks shoved into the old fireplace, and we can still see the firebox and firebrick. Nothing pretty though.

A lot of plaster came off with the wallpaper, so we thought, “Sod it, let’s see what the stone walls are like.”

Turns out, the interior stone wall is in pretty good shape. It’ll need repointing and whatnot, but we may make it a feature stone wall and limewash it.

Big mess

Feature wall, yes?

The rest of the walls, we’ll repoint then insulate with cork boards (probably) and lime plaster. We may put some wood panelling up. No idea yet. Watch this space!

Creatures On The Ceiling

One thing we will miss about sleeping in that room is our Ceiling Creature Companions. When we had the timbers sandblasted, it created some interesting shapes on the plasterboard. Like this velociraptor:

The velociraptor

The velociraptor

And this kingfisher:

The Kingfisher

The Kingfisher

Anyway – having made a mahoosive mess, we’re done for the day. Tomorrow will be more of the same if the weather is wet, or we’ll knock a great big hole in the front of the house again.

Newer posts »